16 Years Manufacturer ISO 9001/14001/45001 Export to 30+ Countries VOC<50g/L Eco-Friendly
Sales: +86 133-492-51166
Tower Specialists Water-Based Global Projects

Tower Coating Solutions

Professional protection systems for communication and power transmission towers. Proven on thousands of towers worldwide with eco-friendly water-based coatings.

Based on extensive experience coating thousands of microwave communication towers and power transmission towers worldwide, we offer proven solutions for various environmental conditions. All our systems use eco-friendly water-based coatings with excellent anti-corrosion performance, VOC <50 g/L, and comply with international standards.

ISO 9001 / 14001 / 45001 Certified
Trusted by Huawei, ZTE, France Telecom
Sea & Air Transport Approved

Recommended Coating Systems

Select the right system based on your environment and service life requirements

Standard
Basic Protection
3-5 Years
PRIMER
XGE-920 (Grey)
TOPCOAT
XGE-921 (Red/White)

Cost-effective two-coat system for standard tower protection in mild to moderate environments. XGE-920 primer provides excellent adhesion to galvanized surfaces.

View Details
Enhanced
Enhanced Protection
5-8 Years
PRIMER
XGE-920 (Grey)
TOPCOAT
XGE-922 (Custom)

Enhanced protection with acrylic polyurethane topcoat for superior weather resistance. Ideal for coastal areas and regions with high UV exposure.

View Details
Premium
Premium Protection
8-10 Years
PRIMER
XGE-HY (Iron Red)
TOPCOAT
XGE-930 (Silver White)

Long-term protection using high-performance epoxy primer and galvanized-look topcoat. Designed for harsh industrial, marine, and tropical environments.

View Details
Advanced
Advanced Protection
10-15 Years
PRIMER
XGE-HY (Iron Red)
INTERMEDIATE
XGE-HY-B (MIO)
TOPCOAT
XGE-922 (Custom)

Three-coat system with epoxy primer, MIO intermediate, and polyurethane topcoat. Excellent chemical resistance for industrial zones and polluted areas.

View Details
Quick
One-Coat System
4-8 Years
PRIMER & TOPCOAT
XGE-301 (Orange/Red/Black/Grey)

Single-coat primer and finish solution for fast application and maintenance projects. Simplifies application process while maintaining anti-corrosion performance.

View Details

Standard Application Procedure

1
Surface Preparation

Clean substrate thoroughly, removing oil, dust, and contaminants. Pay special attention to galvanized layer treatment.

2
Primer Application

Apply water-based anti-rust primer using spray, roller, dip, or brush method.

3
Drying

Allow primer to dry completely. Typical: 4-8 hours at 23°C with proper ventilation.

4
Topcoat Application

Apply water-based anti-corrosion topcoat to achieve specified film thickness.

5
Final Drying

Ensure thorough ventilation. Protect from rain for at least 10 hours after application.

6
Touch-Up & Inspection

After installation, inspect and touch up any damaged areas. Perform final quality check.

Our Partners & Clients

Trusted by leading enterprises worldwide

Huawei ZTE CNOOE Xingyue Tower XMA Tower ZJSDTT France Telecom Cumulus Communications Wuxiao Towers China Qingdao Huijintong