One-Coat System · 4-8 Years

Telecom Tower Anti-Corrosion Coating Process

One-CoatFast ApplicationEasy Maintenance.XGE-301 One-Coat paint combinesPrimerTopcoatinto one,1 coat achieves 4-8 year protection comparable to traditional 2-coat.For Rapid Refurbishment / Maintenance / Time-Critical scenarios. Orange/white coating provides both aviation warning and industrial aesthetics.

SubstrateHot-Dip Galvanized Steel
SystemOne-Coat (1-Coat)
ProductXGE-301
ColorOrange/White
Service Life4–8 Years
EnvironmentC2–C3 Moderate
Completion Time4–8h / Tower
1

1 Coat = Double Protection

XGE-301 One-Coat paint combines Primer + Topcoat into one, with 1 spray coat achieving 80% of traditional 2-coat performance.

2

4–8h Completion / Tower

EliminatesPrimerDrying / Intermediaterecoating steps,4–8 hours for complete tower coating, reducing project duration by 50%+.

3

Maintenance / Refurbishment Preferred

Single-coat application / low equipment requirements, 40% lower maintenance costs,Ideal for in-service towerRapid RefurbishmentSpot Repair.

01

System Overview

Telecom Tower (angle-steel tower) Orange/white aviation warning coating,One-CoatThickness ≥ 100 μm.

XGE-301 Orange/White Hot-Dip GalvanizedSubstrate Zn XGE-301 One-Coat 100–150 μm Environment Single-Layer Substrate 1 Coat XGE-301 ≥ 100μm ~30m 0m

One-CoatProduct

301

XGE-301 One-CoatPaint

Primer & Topcoat · 2-in-1 · Modified Acrylic
DFT 100–150 μm 1 Coat Application Quick-Dry

OptionalColor

OR
RD
BK
GY
This Scheme: Orange/White
Orange/White Horizontal Warning Bands · ICAO Compliant

Total DFT

One-Coat
100 μm
Up to
150 μm
02

6 -Step SimplifiedProcess

Compared to 2-Coat / 3-CoatSystem,EliminatesPrimerDryingTopcoatrecoat waiting,50% efficiency gain.

Step 1 01

SubstrateInspection

Verify galvanized layer condition; clean oil, zinc salts, and loose particles.

· ISO 1461 Galvanizing · No loose rust
~30 min
Step 2 02

Surface Preparation

Manual / power tool cleaning to St 3, or light sweep blasting.

· ISO 8501-1 St 3 · Or light blast Sa 2
~1–2 h
Step 3 03

Spray XGE-301

Airless spray 1 coat, wet film ~180 μm, single-coat application.

· DFT 100–150 μm · Spray pressure 15 MPa
~2–3 h
Step 4 04

Warning Band Spray

Tape-positioned orange/white warning band spray (XGE-301 + XGE-301 White).

· 200–300mm band width · Alignment ±2mm
~1 h
Step 5 05

Quality Final Inspection

Single-layer DFT, color difference, adhesion, warning band dimensions inspection.

· DFT ≥ 100 μm · Adhesion ASTM 0 Rating
~30 min
Step 6 06

Delivery

Touch-dry 30 min / hard-dry 6 h, ready for service.

· Touch-dry 30 min · Hard-dry 6 h
⚡ 4–8h Completion
03

DetailedProcess

6-step process, 3 quality gates,Rework on non-conformance.Processprocess nodes vs. 2-CoatSystem 60%.

flowchart TD Start([Site Survey
Maintenance / Refurbishment / Time-Critical]) --> S1[1 · SubstrateInspection
Galvanizing + oil removal] S1 --> Q1{QualityGate 1
SubstrateOK?} Q1 -- No --> R1[Clean / Repair] R1 --> S1 Q1 -- Yes --> S2[2 · Surface Preparation
St 3 or Sa 2 Light] S2 --> S3[3 · SurfaceCleaning
Oil-free compressed air blow] S3 --> Q2{QualityGate 2
CleanlinessOK?} Q2 -- No --> S2 Q2 -- Yes --> P1[4 · Spray XGE-301
One-Coat 100–150μm
1 Coat Application] P1 --> S4[5 · Warning Band Spray
Orange/WhiteAlternating · TapePositioning] S4 --> Q3{QualityGate 3
DFT + Color + For?} Q3 -- No --> Fix[Spot Repair] Fix --> Q3 Q3 -- Yes --> End([Delivery · Protection 4-8 Year
4-8h Completion]) classDef prep fill:#fbfaf6,stroke:#a8a39a,stroke-width:1.5px,color:#14171e classDef coat fill:#f7e1cf,stroke:#e8772e,stroke-width:2px,color:#14171e classDef qc fill:#f3e3d0,stroke:#c97b3f,stroke-width:1.5px,color:#14171e classDef end fill:#e8772e,stroke:#e8772e,stroke-width:2px,color:#ffffff class Start,End end class S1,S2,S3,S4 prep class P1 coat class Q1,Q2,Q3,Fix,R1 qc
SubstratePrep
XGE-301 One-Coat
Quality Gate / Repair
04

Economic Comparison · One-Coat vs Basic

One-CoatSysteminMaintenance / RefurbishmentProjectinSignificant economic advantages.

Basic 2-Coat XGE-920 + XGE-921

Coats Required3 Coats (Primer+Topcoat+Recoat)
Drying WaitPrimer 6h + Topcoat 24h
Equipment RequiredAirless Spray + Forced Ventilation
Labor / Tower~16-24 h
Material Cost¥¥¥ (2 Product)
Suitable ForNew Build / Long Life

One-Coat XGE-301 One-Coat

Coats Required1 Coat (One-Coat)
Drying WaitTouch-Dry 30min / Hard-Dry 6h
Equipment RequiredAirless Spray Only
Labor / Tower~4-8 h (↓ 60%)
Material Cost¥¥ (1 Product)
Suitable ForMaintenance / Refurbishment / Rush
05

TypicalSuitable ForScenario

XGE-301 One-CoatSystemBest Suitedfor the following fourProject.

In-service towerRapid Refurbishment

For in-service towers built 5-10 years ago,With partial coating failure,NeededRapid Refurbishmentwithout service interruption,XGE-301 One-CoatRefurbishmentEfficiencyMaximum.

Emergency / Rush Projects

Emergency tower construction after natural disasters,Requiring 24-48 hour completion,XGE-301 One-Coat + quick-dry propertiesYesOnlyChoice.

Temporary / Semi-Permanent Towers

5G micro-sites, temporary construction towers, event towersProjects with 3-5 year design life,NoAdvancedAnti-CorrosionSystem,One-CoatEconomicMostbest.

Budget-Sensitive Projects

Projects with extreme per-tower cost sensitivity,1 CoatCoat = 1 Product = material & labor savingsCost 40% +,4-8 year life covers most scenarios.

06

Quality Control & Key Parameters

Simplified QC process, 9 core metrics; critical focus on single-layer DFT and adhesion.

  • Galvanizing Thickness ≥ 85 μm
  • Surface Cleanliness St 3 / Sa 2
  • EnvironmentHumidity 5-35℃ / RH ≤ 85%
  • Single-Layer DFT 100-150 μm
  • Adhesion (Cross-Cut) ASTM 0-1 Rating
  • Gloss (60°) ≥ 70 GU · Semi-Gloss
  • Appearance / Color Orange/White · ΔE ≤ 1.5
  • Touch-Dry Time ≤ 30 min / 25℃
  • Neutral Salt Spray 720h · No Blistering

ApplicationEnvironment

EnvironmentTemperature
5–35℃
Relative Humidity
≤ 85%
Dew Point Spread
≥ 3℃
Wind Speed
≤ 5 m/s

Coating Thickness

One-Coat
100 μm
Up to
150 μm
07

5-RatingProtectionSystemCompleteComparison

One-Coat as the rapid maintenance solution,with the other fourRatingforms a completeProductMatrix.

Basic

3-5 Year
Structure2-Coat
Product920+921
DFT≥ 140μm
Salt Spray500h
Labor~16-24h

Enhanced

5-8 Year
Structure2-Coat
Product920+922
DFT≥ 180μm
Salt Spray1000h
Labor~20-28h
Quick

One-Coat

4-8 Year
Structure1 One-Coat
ProductXGE-301
DFT≥ 100μm
Salt Spray720h
Labor~4-8h ⚡

Advanced

15+ Year
Structure3-Coat
ProductHY+HYB+922
DFT≥ 280μm
Salt Spray4200h
Labor~32-48h

Premium

10-15 Year
Structure2-Coat
ProductHY+930
DFT≥ 220μm
Salt Spray3000h
Labor~24-36h
08

Key Application Notes

One-CoatSystemspecificApplicationPoints,Ensure 1 coat achieves 4-8 year service life.

One-CoatApplicationKeyPoints

  • XGE-301 Single-pass wetDFT recommended 150-220 μm,1 spray achieves 100-150 μm DFT,Avoid multiple passes causing sagging.
  • Surface PreparationMostminimum St 3 Rating (power tool cleaning),Sa 2 light blast recommended where possible for better adhesion.
  • Touch-Dry 30min / Hard-Dry 6h ready for service,But full cure takes 7d,Avoid heavy impact and chemical contact during cure.
  • One-CoatSystemnotSuitable For C4 + corrosionEnvironment,Prolonged high temp (>80°C), strong acid/alkali/solventEnvironmentpleaseChoice2-Coator 3-CoatSystem.
  • Recoat XGE-301 over itself,No sanding needed; direct overcoating,for easyMaintenancePhaseSpot Repair.